program:

925 pacific: 20 residential units w/ spa in cellar and terrace on roof / gross area: 26,000 sf

concept:

the design is an updated concept of 190 green street with improvements in layouts, circulation and the design of the rear yard area.

team:

LD5: harry knoll, werner morath and sam bargetz

Structural design: Murray Engineering PC

MEP: IVLN Consulting Engineers

Interior Design: Durukan Design

status:

may 2005: schematic design

july 2005: filing at DOB

nov 2005: start of construction

march 2008: final CofO

close window