program:
19 residential units in 3 buildings with one central circulation core / indoor parking in cellar
concept:
the design of the building is a direct reaction on the site specific zoning conditions.the odd shaped lot is divided by a zoning district boundry which is parallel to washington avenue.
furthermore the proximity to the street corner of one part of the lot permits the rear building and the central staircase.
the gap between the two front buildings is full height and houses the horizontal circulation in form of an open breezeway.
team:
harry knoll, werner morath and sam bargetz
consultants:
structural: RMEMEP: TBD
expediting: Joseph Fellner
status:
august 2005: schematic design phasejan 2006: filing drawings